泥水盾构施工泥膜成膜质量控制试验研究——以穿黄隧洞工程为例  被引量:1

Experimental Research on the Quality Control of Slurry Membrane in Slurry Shield Construction of the Yellow River Crossing Tunnel Project

在线阅读下载全文

作  者:陈芝春 张振坤 徐志强 

机构地区:[1]中国能源建设集团有限公司工程研究院,北京100029 [2]中国能源建设集团有限公司,北京100029

出  处:《水电与新能源》2015年第4期5-8,共4页Hydropower and New Energy

摘  要:在穿黄隧洞盾构施工过程中,基于泥水平衡盾构施工原理与穿黄工程的地层特性、地下水特点,针对泥浆配置与性能优化问题展开试验研究,提出了适于穿黄工程不同地质条件和地层特点的泥浆配置技术,为穿黄盾构掘进提供了性能优良、有针对性的泥浆配置方案。In-situ experiments are carried out in the slurry shield construction of the Yellow River Crossing Tunnel Pro -ject to investigate the configuration and performance optimization of the slurry, considering the principles of slurry bal-anced shield construction and the specific characteristics of the ground formations and the groundwater.Slurry configura-tion technology is then developed for different geological conditions and formation features.High-performance slurry con-figuration scheme is also proposed specifically for the slurry shield construction of the Yellow River Crossing Tunnel Pro -ject.

关 键 词:泥水盾构 泥水特性 泥膜 穿黄隧洞工程 

分 类 号:U455.43[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象