斯里兰卡汉班托塔港二期码头结构优化  被引量:3

Optimization for wharf structure of Hambantota Port development project phase II in Sri Lanka

在线阅读下载全文

作  者:赵瑞东[1] 吴遵奇[1] 邓凌[1] 

机构地区:[1]中交第四航务工程勘察设计院有限公司,广东广州510230

出  处:《中国港湾建设》2015年第4期24-27,共4页China Harbour Engineering

摘  要:结合斯里兰卡汉班托塔港口二期工程干地施工的条件,在一期码头常规沉箱的基础上提出了多种结构优化形式,对优化思路进行分析对比,最终采用新型箱肋式重力码头结构,体现了沉箱结构整体性好的特点,充分利用扶壁结构的受力特点,解决扶壁结构应用于大型码头结构时受力较大的问题。Combined with the dry construction condition of Hambantota Port development project phase Ⅱ in Sri Lanka, based on the regular caisson for Hambantota Port development project phase Ⅰ, we put forward multiple optimized structure types. Through the comparative analysis of them, we finally adopted the new type buttress caisson gravity wharf structure, which re-flects that the caisson has good structural integrity, making full use of the loading features of buttress, and solving the problems for the buttress applying on large wharf.

关 键 词:码头 扶壁 箱肋式 沉箱 干地施工 

分 类 号:U656.1[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象