SF_6环网开关柜合闸不同期测试结果的不确定度评定  被引量:1

Uncertainty Evaluation of Measurement Result of Switching Non-Synchronization for SF_6 Ring Main Unit

在线阅读下载全文

作  者:陈荣辉[1] 李志胜[1] 

机构地区:[1]国家中低压输配电设备质量监督检验中心,广东东莞523325

出  处:《机电工程技术》2015年第4期130-132,共3页Mechanical & Electrical Engineering Technology

摘  要:不确定度表明测量结果的可信赖程度,在报告物理量测量结果时,给出相应的不确定度,一方面便于评定其可靠性,另一方面也增强了测量结果间的可比性。首先简单介绍了SF6环网开关柜合闸同期性的重要性与不同期合闸所产生的危害,给出了一个用开关机械特性测试仪测量合闸不同期的例子,并且对测量结果进行了不确定度评定。Uncertainty indicates the trustworthiness of measurement result. Gives the corresponding uncertainty in reporting the result of physical measurement, on one hand to facilitates the assessment of its reliability, on the other hand to enhances the comparability of measurement result. Firstly, this paper briefly introduces the importance of switching synchronization of SF6 ring main unit and the hazards arising from switching non-synchronization. Then gives a switching Non-synchronization testing example using switch mechanical properties tester, and evaluates the uncertainty of measurement resuh.

关 键 词:SF6环网柜 合闸不同期 不确定度 

分 类 号:TM591[电气工程—电器]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象