摘  要:针对印度尼西亚TJK电厂65 MW机组投运后存在的"极热态启动时负胀差偏大而且超限"问题,通过技术分析找出主要原因,制定出改造方案并在大修中实施。改造结果表明:该方案解决了机组在极热态启动时负胀差偏大的问题,大修后机组实现了随启随停。Aiming at the problem that negative expansion difference is big and over the limit when the units extreme hot start of 65 MW unit after the commission in TJK Power Plant of Indonesia, finds out the main causes by technical analysis,frames the improvement project and puts in heavy repair practice. The improvement result shows that the project solve problem of negative expansion difference is big when the units in extreme hot start,after heavy repair the unit realizes start-up and shut-down at any time.

关 键 词:极热态启动 负胀差 轴封改造 

分 类 号:TK267[动力工程及工程热物理—动力机械及工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象