PPP项目运营期间需求量下降情形下的补偿机制研究  被引量:57

PPP Projects: A Study of Compensation Mechanism with Unmet Demand

在线阅读下载全文

作  者:高颖[1] 张水波[1] 冯卓[1] 

机构地区:[1]天津大学管理与经济学部,天津300072

出  处:《管理工程学报》2015年第2期93-102,共10页Journal of Industrial Engineering and Engineering Management

基  金:国家自然科学基金资助项目(71172149);国家自然科学基金重点资助项目(71231006)

摘  要:本文以最终用户付费的交通类PPP项目为分析对象,研究需求风险发生后政府如何采用需求量补偿机制以实现私人部门收益和消费者剩余的帕累托改进。本文构建了私人部门收益和消费者剩余模型,分析、比较了价格上限不变和价格上限可重新设定两种情形下需求量补偿机制对私人部门收益和消费者剩余的影响,分析了该补偿机制能够实现帕累托改进的条件,同时通过算例进行了仿真验证。结果表明:(1)在价格上限不变的情形下,需求量补偿机制只会诱导私人部门提高收费价格,损害消费者剩余,此时并不存在有效的需求量补偿范围;(2)当政府重新设定合理的价格上限并且双方的重新谈判成本较低时,存在有效的需求量补偿范围来实现私人部门收益和消费者剩余的帕累托改进。Public-Private Partnership (PPP), as an innovative way to provide infrastructure by the private sector, is widely adopted throughout the world. One of the most important risks faced by the private sector is demand risk. For years researchers have focused on how this kind of risk should be distributed between the government and the private sector. Some researchers argue that parties subject to losses should undertake the risk, which will help stimulate them to do better risk control. However, the demand risk is exogenous and thus cannot be prevented or controlled by either party. Considering the cooperation feature of PPP between the government and the private sector, the demand risk should be shared by both parties. Researchers put forward that signing ex ante guarantee arrangement with the government can be regarded as a method to reduce the risk losses of the private sector. However, the demand guaranteed by the government is specified at the time of contract signing before the occurrence of risk, problems of overcompensation or undercompensation may emerge due to bounded rationality. Therefore, currently researches have shifted their attention to how the compensation amount should be determined by the government when the demand risk occurs. At present, there are two research gaps with regard to this issue. First, scholars failed to take into consideration the calculation method of compensation amount in their studies, leading to ambiguity and even possible occurrence of corruption as perceived by the public when the government honours compensation. To solve this problem, the demand compensation mechanism should be proposed and detailed, thus making the compensation process a transparent one. Second, previous studies only focused on efficiency improvement, leaving fairness of distribution neglected, which is harmful to the sustainable development of PPP projects. Therefore, both of private sector's benefits and consumer surplus should be paid attention to when the government compensates the private secto

关 键 词:公私合营模式(PPP) 重新谈判 需求风险 补偿机制 

分 类 号:F224[经济管理—国民经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象