洞松水电站厂房后边坡预应力锚索施工质量控制  

Quality Control for Prestressed Anchor Cable Construction in Rear Slope of Powerhouse at Dongsong Hydropower Station

在线阅读下载全文

作  者:杜林 梁伟 

机构地区:[1]中国水利水电第十工程局有限公司,四川成都610072

出  处:《四川水力发电》2015年第2期68-70,共3页Sichuan Hydropower

摘  要:预应力锚索是边坡经常使用的加固手段之一,因其作业工序特殊,又属于地下隐蔽工程,对其质量的管控只能从工序上进行把控。以洞松水电站厂房后边坡锚索施工为例,从原材料、施工工艺流程及作业工序等方面详细叙述了预应力锚索施工质量控制的细节,可供从事相关专业的人员参考。Prestressed anchor cable is one of reinforcement measures in slope stabilization. Construction quality is usually controlled from the process due to its special operation procedure and underground engineering.Taking the anchor cable construction in rear slope of Dongsong powerhouse as an example,details in prestressed anchor cable construction quality control are described in aspects of raw materials,construction technology process and operation procedure to provide references to related technical personnel.

关 键 词:洞松水电站 厂房边坡 预应力锚索 工序作业 质量控制 

分 类 号:TV551.4[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象