检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:沙鹏[1,2] 伍法权[1] 李响[3] 梁宁[1,2] 常金源[4]
机构地区:[1]中国科学院地质与地球物理研究所页岩气与地质工程重点实验室,北京100029 [2]中国科学院大学,北京100049 [3]中铁第一勘察设计院集团有限公司,陕西西安710043 [4]绍兴文理学院土木工程学院,浙江绍兴312000
出 处:《岩土力学》2015年第5期1407-1414,共8页Rock and Soil Mechanics
基 金:国家自然科学基金重点项目(No.41030749);铁一院科研开发计划(院科12-06-1)资助
摘 要:西部地区普遍出露层片状岩体。由于强度低、自稳能力差、结构强度呈现各向异性等特点,在隧道开挖过程中常引起围岩大变形,导致初期支护结构强烈变形失稳而不得不频繁进行拆换。部分洞段二次衬砌混凝土甚至发生劈裂、掉块的破坏现象,严重影响隧道施工的进度与安全。以兰渝铁路两水隧道为工程背景,采用现场实时监测、数值模拟等手段,获取大断面隧道围岩与支护系统之间的接触压力,揭示开挖断面不同位置接触压力随时间发展规律和空间分布特征。研究结果显示,受围岩结构强度的各向异性控制,隧道开挖后支护受力极不均匀。空间上与围岩变形集中部位一致,时间上变化历时长,且由于开挖方式的影响不易稳定。初期支护钢拱架局部荷载过大而发生侧向扭曲失稳,且监测的失稳发生时间与收敛形变稳定时间相比而明显滞后。根据层状围岩的支护受力特征,提出针对此类岩体更为合理的隧道设计建议。The layered soft rock is widely distributed in Western China, such as slate, carbonaceous slate, phyllite, and so forth. During the tunnel excavation, geotechnical problems frequently occur in the surrounding rock, such as excessive overbreak and intense deformation associated with asymmetric squeezing, because of low strength, poor self-stability and intense anisotropy of structural strength in layered surrounding rock. Large deformation can result in intense damage to the primary support, and even splitting of secondary support, significantly influencing the construction and security of tunnels. At the site of Liangshui tunnel in Lanzhou-Chongqing railway, a series of real-time contact pressure monitoring tests is conducted at different positions in section between surrounding rock and support system. Mechanical responses of the support system are analyzed in time and spatial domains using the monitored contact pressure. In-situ monitoring and numerical inversion analyses of displacement are also performed. The results indicate that the contact pressure of support system shows irregular distribution in space, which agrees with the concentrated deformation position of the surrounding rock; and its variation often lasts for a long period of time due to the influence of excavation method. The failure of the steel arch frame takes place in the weak axis plane because of its smaller lateral anti-bending rigidity. Meanwhile, the monitoring data show that their occurrence significantly lags behind the stabilization of convergence deformation. Based on the force characteristics of the support system, a more reasonable design scheme is proposed for tunneling in such a kind of rock.
关 键 词:隧道工程 现场监测 支护体系 受力特征 数值分析
分 类 号:U452[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.158