朔黄线换装ZYJ7外锁闭道岔转辙设备调试探讨  被引量:4

Switching Equipment Commissioning for Replacing ZYJ7 External Locking Switch on Shuo-Huang Railway Line

在线阅读下载全文

作  者:樊国智 

机构地区:[1]朔黄铁路肃宁分公司,河北肃宁062350

出  处:《铁路通信信号工程技术》2015年第2期79-82,85,共5页Railway Signalling & Communication Engineering

摘  要:介绍朔黄线在换装ZYJ7外锁闭道岔转辙设备调试中把好线下电机和外锁设备安装关,确保道岔工、电设备几何尺寸达标;采用模拟电路试验方法,把好线下调试、试验关,确保室内配线的正确;把好上线调试关,确保转辙设备上线后联锁关系正确。This paper introduces the switch equipment commissioning for replacing ZYJ7 external locking switch on Shuo-Huang railway line, including how to ensure both track and signal equipment installed correctly through checking on the installation of the electric machine and external locking equipment, how to ensure indoor wiring laid correctly through checking on analog circuit test, and how to ensure interlocking relationship being correct after switch equipment putting into service through checking on switch equipment commissioning onsite.

关 键 词:转辙设备调试 外锁闭道岔 ZYJ7 重载线 换装 

分 类 号:U216.425[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象