检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:屈志勇[1] 李松磊[1] 潘兴军[1] 刘扬[1]
机构地区:[1]中水北方勘测设计研究有限责任公司
出 处:《水利水电工程设计》2015年第2期44-47,56,共4页Design of Water Resources & Hydroelectric Engineering
摘 要:碳酸盐岩地区修建水库,岩溶渗漏是首要的工程地质问题,直接决定了是否可以建库以及水库效益。以大兴水利枢纽工程为例,对成库条件进行了勘察评价。勘察期间,运用勘探及岩溶调查等方法,对该地区碳酸岩岩溶发育规律及地下水水文地质问题进行研究,从而得出水库正常蓄水位下该水库不存在邻谷渗漏、库首经工程处理不会发生集中渗漏的结论。If a reservoir is proposed to be constructed in a carbonate rock area,the first engineering geological problem to be considered is karst leakage,it directly determines whether the reservoir can be built and its benefit.This text makes an investigation and evaluation on reservoir construction conditions by taking Daxing reservoir as an example.During the investigation,it uses the exploration and karst investigation methods to study the development law of carbonate rock karst and hydrogeological problems of groundwater in the area,and then draw the conclusion that there is no neighbor valley seepage under normal water level of the reservoir,and concentrated leakage will not occur at the head of reservoir after engineering treatment.
分 类 号:P642.25[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.88