高瓦斯综放工作面瓦排巷墩柱支护技术研究  

Study on Pier Supporting Technology of Gas Drainage Gateway of Full-mechanized Caving Mining Face

在线阅读下载全文

作  者:王吉生[1,2] 陈继刚[1,2] 王刚 

机构地区:[1]中国矿业大学(北京)资源与安全工程学院,北京100083 [2]潞安集团余吾煤业公司,山西长治046103

出  处:《煤》2015年第5期5-7,11,共4页Coal

摘  要:高瓦斯矿井综放工作面采用双"U"型通风方式解除瓦斯的制约,但外圈巷道受动压影响变形大(底鼓量高达2.0 m),严重影响通风和行人的安全,一般采用木垛进行加强支护,效果不好。为此,提出了用高水速凝材料墩柱代替木垛进行加强支护。FLAC3D数值模拟及现场矿压观测结果显示,墩柱支护优于木垛支护,并能有效地控制巷道围岩变形,平均每米巷道节约4 243元,效益明显,为类似地质条件下巷道支护提供一种行之有效的方案。The fully mechanized coal face of high- methane coal mine adopting double "U" type ventilation way remove the threat of methane. But the outer roadway affected by the dynamic pressure bringing about severe deformation (the heaving floor reach up to 2.0 m) , seriously affect the ventilation and pedestrians'safety. The general use of the crib timbering to reinforce supporting is unsatis- fied. Therefore, the reinforcement method of high - water and quick - setting pier instead of crib timbering is put forward. FLAC3D nu- merical simulation and field - observation results of rock pressure showed that the supporting can effectively control the deformation of surrounding rock of roadways and better than crib timbering, and save 4 243 yuan per meter roadway , benefit is obvious . This pro- vides an effective support scheme for roadway support in the similar geological conditions.

关 键 词:底鼓 双U型 木垛 墩柱 

分 类 号:TD355[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象