检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蔡光哲[1] 黄相军[1] 张雨豪[1] 黄远泽[1]
机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021
出 处:《东北水利水电》2015年第5期8-10,共3页Water Resources & Hydropower of Northeast China
摘 要:文中介绍了二期截流设计中截流时段、标准及流量的选定过程,并提出了龙口段分区规划及截流的施工组织要求。实践证明,该工程龙口位置的选择及龙口宽度的确定是合理有效的,在二期截流实施过程中最大限度的减少了工程施工对松花江通航的干扰。The paper introduces the selection process of river closure period, standard and flow in the river closure design of second-stage project and puts forward the district planning of closure gap section and the construction organization requirement of river closure for the Dadingzishan navigation and hydropower project. The practice shows that the position selection and the width determination of closure gap are rational and effective, which could minimize effect of the project construction on navigation of Songhuajiang river in the construction of second-stage river closure.
分 类 号:TV551[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229