检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王渝[1]
机构地区:[1]中铁第一勘察设计院集团有限公司,西安710043
出 处:《铁道标准设计》2015年第6期161-164,共4页Railway Standard Design
摘 要:基于兰州至中川机场铁路的功能定位,依据铁路技术政策和标准、已开通和在建项目的情况,对CTCS-2与CTCS-0列控系统进行比较,并对无配线车站信号系统、信号系统与站台门系统结合的特殊信号方案进行研究。最终选择满足铁路运营需求的CTCS-2信号系统,并将所研究的信号系统方案应用于实际建设,为类似工程的信号系统设计提供参考借鉴。Based on the function of the Lanzhou to Zhongchuan airport railway line, the railway technical policies and standards, and the situations of completed and under-construction projects, CTCS-2 and CTCS-0 train control systems are compared, and the special signal design schemes for non-wiring station signal system and the interconnection of the signal system with the security door system are studied. Finally, the adaptive CTCS-2 train control system is selected, and the signal design schemes analyzed are applied in the actual construction, providing references for design of similar projects.
关 键 词:城际铁路 列控系统 信号系统 无配线车站 站台门
分 类 号:U284[交通运输工程—交通信息工程及控制]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.217.160.127