检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王宪宝
机构地区:[1]新疆维吾尔自治区伊犁水文水资源勘测局,新疆伊宁835000
出 处:《吉林水利》2015年第5期56-58,共3页Jilin Water Resources
摘 要:在水文分析计算中,设计洪水过程线是水利工程防护安全的重要依据,在因采用的方法不同,所涉及的洪水过程线的方法也有较大的差异,也影响到防洪工程的设计指标,本文通过实例就水文设计规范中常用的同倍比放大法和同频率放大法[1]两种放大方法进行比较,分析其优、缺点和适用性,以便在实际中具体应用。In the hydrological calculation,design flood hydrograph is an important basis for safe water conser-vancy protection,due to the different methods used in flood hydrograph methods,involved are also great differ-ences,which also affect the design specifications flood control projects.This article,taking an example of engi-neering practices,carried out comparison between usual amplification method and the same frequency amplifi-cation method in the hydrologic design specifications.It analyze the advantages and disadvantages and appli-cability to the specific application in practice.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38