检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Mahmoud Mohamed Mahmoud Sharaf Hassan T. Abdelwahab
机构地区:[1]International Department, Acciona Engineering S.A., Doha 26026, Qatar [2]College of Engineering, Cairo University, Giza 12411, Egypt
出 处:《Journal of Civil Engineering and Architecture》2015年第5期526-533,共8页土木工程与建筑(英文版)
摘 要:Egypt construction projects are associated with different levels of risks. The lack of familiarity of project management standards is one of the common risks in the construction industry in Egypt. The main aim of this paper is to identify the most significant risk factors affecting highway construction project in Egypt to decrease the likelihood and impact of those risks. The research method starts with extensive literature review to provide a prime risk factors list which was also augmented to expertise to reach final risk factor list which contains all risks that may be faced during highway construction. Subsequently, a set of 12 risk groups consisting of 73 risks was selected and a questionnaire survey was conducted to determine the likelihood and consequences of the identified risks. Later, a software application was developed using MATLAB to facilitate risk evaluation of highways projects. Results indicated that the risk factors arise from owner side is one of the most common risk factors in the construction industry in Egypt as the owner in the majority of construction project in Egypt is the governmental sector, however, the overall project risk of highway construction projects in Egypt is considered as at a medium level.
关 键 词:Risk management highway projects artificial intelligence construction in Egypt.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28