检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱柳慧[1] 肖烨辉[1] 倪汝冰 费斌[1] 钱程晨[1]
机构地区:[1]国网上海市电力公司检修公司,上海200063
出 处:《电力与能源》2015年第2期272-276,共5页Power & Energy
摘 要:南桥站光纤改造工程项目为我国首个长期运行后的高压直流换流站更换换流阀光纤的项目。在初次安装阶段对空间电磁感应造成的影响考虑不足,造成VBE柜内多点放电。通过优化光纤表面的处理配方及在线涂覆工艺,解决光纤与护套的介电性能匹配问题,并采取等电位铜板、阻燃海绵和阀基电子设备(VBE)柜光纤固定夹板处接地措施后,运行情况良好,至今无任何放电和损坏发生。The optical fiber reform project for Nanqiao converter station is the first project in China to replace the converter valve fiber for HVDC converter station after a long-term operation. During the initial installation phase, there was multiple-point discharge in VBE cabinets due to the ignorance of the impacts of space electro magnetic induction. The dielectric property matching problem betwee the optical fiber and its jacket is resolved by means of optimizating the surface treatment of fiber and on-line coating technology. The valve set is in good condition, and there is no recurrence of discharge and damage after the grounding measures by equipotential copperplate, fire-retardant foam and the optical fiber fixed-splints in VBE cabinets.
关 键 词:500kV南桥换流站 光纤 放电 绝缘
分 类 号:TM853[电气工程—高电压与绝缘技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.42