检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨树[1]
机构地区:[1]海洋石油工程股份有限公司设计公司,天津塘沽300451
出 处:《船舶工程》2015年第5期94-96,105,共4页Ship Engineering
摘 要:东海某DPP平台投产近十五年后,出现设备老化、工艺系统处理量发生变化等情况,从而透平电站、热油锅炉和工艺处理系统出现余热,如何减少能源浪费,及时有效回收利用,需要及时解决问题。通过对基础资料分析研究、平台生产实地调研,提出余热利用方案,并进行成本投资/回报比较,最终验证了方案的正确性。A DPP platform in the East China Sea has been operating for nearly fifteen years. There occur the conditions of the aging equipment and changing capacity of the process system. Thus turbine power plant, thermal oil boiler and process treating system have waste heat. It needs to be solved in time how to reduce energy waste and do recovery and utilization timely and effectively. Based on the analysis and study of the basic data and the field production, the waste heat recovery plan is proposed. The cost of investment and return are compared. Finally the validity of the plan is verified.
关 键 词:海洋石油平台 余热回收 透平电站 烟气废热 工艺生产水 热油锅炉
分 类 号:P751[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49