检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:韩强[1]
机构地区:[1]华东政法大学
出 处:《法学研究》2015年第3期47-61,共15页Chinese Journal of Law
摘 要:违约金在历史上仅作为债务履行的担保工具而存在。为促使债务人履行债务,当事人往往约定较高数额的违约金,以形成一种履行上的压力。此类违约金的目的在于担保履行,而非解决损害赔偿,是固有意义的违约金。同时,此类违约金也并非当然具有惩罚违约行为之目的。而惩罚性违约金的效力在于,违约方除须支付违约金外,尚须继续履行债务或者负担损害赔偿债务。赔偿性违约金本不属于违约金之范畴,原系当事人在订立合同时对损害赔偿总额之预定。后世法律为简化损害赔偿程序、平衡当事人利益,将违约金推定为损害赔偿总额预定,遂产生赔偿性违约金。我国合同法第114条以规范赔偿性违约金为主,但亦不完全否定惩罚性违约金,其主要问题在于,违约金固有的担保功能丧失殆尽,而赔偿性违约金之简化损害赔偿的功能也没能充分发挥。应对合同法第114条在重新解释的基础上进行必要的改造,以明确违约金的功能定位,并改进其法律效力。In history, liquidated damages existed only as a guarantee tool for the fulfillment of obliga- tion. The parties usually agree on the debtor to fulfill his obligation. stead of settling compensation for a high amount of liquidated damages which form some pressure on This type of liquidated damages aims to guarantee fulfillment in- damages, thus, is liquidated damages in its inherent meaning. Meanwhile, the purpose of such type of liquidated damages does not ment of nonperformance. The function of punitive liquidated ty not only pay liqui dated damages damages , but also continue to fulfill ges. Punitive liquidated damages aim to entitle the creditor to necessarily include the punish- is to ensure that the default par- his obligation or bear the debt of dama- dual benefits and, therefore, shall be strictly restricted. Originally, compensatory liquidated damages are predetermination of damages when both parties are making a contract, hence do not fall into the scope of liquidated damages. In order to simplify the procedure of compensation for damages and balance the benefits of both parties, later laws presume liquidated damages as the predetermination of total amount of damages, hence the emer- gence of compensatory liquidated damages. Article 114 of Contract na primarily focuses on regulating compensatory liquidated tive liquidated Contract Law is damages Law of People' s Republic of Chi- , but does not totally negate puni- damages. The main problem with the provisions on liquidated damages in the Chinese that liquidated damages completely lose their inherent function of guarantee, while the simplified function of compensatory liquidated function and role of liquidated shall be modified on the basis damages does not play a full role. In order to clarify the damages and enhance their legal effect, Article 114 of Contract Law of reinterpretation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222