检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《浙江电力》2015年第5期32-35,共4页Zhejiang Electric Power
摘 要:随着浙江电网规模的不断扩大以及设备智能化,对500 k V变电站实行集中监控成为变电运行的主要运行模式。对集中监控系统和运行管理模式进行了分析总结,根据浙江省调"调控一体化"模式的实际运行情况,探讨了AVC控制、信号过滤与延时、告警抑制、稳态限额监视等方面的优化运行措施。With the continuous scale expansion of Zhejiang power grid and intelligentization of devices, cen-tralized monitoring has become the main operation mode of 500 kV substation. Based on the practical opera-tion of "dispatching and control integration" in Zhejiang Electric Power Dispatching and Control Center, this paper analyzes and summarizes the centralized monitoring system and its operation management mode, and it also discusses operation optimization measures for AVC control, signal filtering and lag, alarm suppression, steady state limitation monitoring, etc.
分 类 号:TM76[电气工程—电力系统及自动化] TM63
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.65