检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国矿业大学(北京)管理学院,北京100083 [2]神华和利时信息技术有限公司,北京100011
出 处:《煤炭工程》2015年第6期140-142,共3页Coal Engineering
摘 要:论述了项目投资管理在企业管理中的地位和作用,从综合能源企业的特点出发,指出了综合能源企业在进行项目投资评估时,不仅要注重项目的经济效益,同时要注重环境效益。运用TOPSIS方法,通过设置经济效益和环境效益两个方面的指标,对项目进行优劣排序。并运用0-1整数规划模型,使企业在资源约束下可以得到项目的最优组合。为综合能源企业的资源平衡配置提供有效的、可量化的判断依据和手段,具有现实的应用意义。The paper discussed the position and role of the project investment management in enterprise management, and pointed out that, according to the feature of integrated energy enterprise, integrated energy companies should pay attention to both economic and environmental benefits. Projects were ranked using TOPSIS method and indexes of economic and environmental benefits. And the 0 - 1 integer programming model was used to get the optimal combination of the projects under resource constraints, so as to provide effective and measurable method for project investment management in integrated energy companies.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38