检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国电大渡河公司新能源公司,四川成都610041 [2]长江水利委员会网络与信息中心,湖北武汉430010
出 处:《人民长江》2015年第11期96-99,共4页Yangtze River
摘 要:总结分析了当前严重影响和制约我国水电工程建设发展的主要疑难问题,即水电建筑市场主体存在垄断、当地相关利益方无休止诉求、相关行业行政主管部门盲目苛求、水电价格长期不合理等。结合当前我国水电工程建设实际,剖析了疑难问题产生的原因,有针对性地探讨了破解对策思路,即重建水电建筑市场主体竞争平台,避免行业垄断;试行利益捆绑式移民补偿方式,避免无休止诉求;科学建立水电项目决策等机制,杜绝资源浪费;建立市场起决定性作用的水电价格机制,还原水电建设应有的盈利能力。The main difficulties that seriously affect and restrict the hydropower development in China are summarized and ana-lyzed, such as the hydropower construction market monopoly, endless appeal of local stakeholders, overcritical demands from rel-evant administrative authority, unreasonable hydropower price. In the combination of practical condition of hydropower construc-tion in China, the causes of these problems are analyzed, and the thought and countermeasures to tackle these problems are dis-cussed, i. e, rebuilding the fair competition platform of hydropower construction market to avoid monopoly, piloting interests-bundled resettlement compensation to prevent the endless appeal, scientifically establishing the decision making system of hydro-power project to avoid waste, setting up the market-oriented price system to restore the profitability of hydropower construction.
分 类 号:TV712[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229