检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《水利水电技术》2015年第1期80-84,共5页Water Resources and Hydropower Engineering
基 金:甘肃引洮供水一期总干渠7#;9#隧洞TBM施工定额研究(041031067)
摘 要:为探究含水疏松砂岩地层引水隧洞冻结施工中冻土帷幕的形成过程及力学特性,对引水隧洞的冻结施工及开挖过程进行三维数值模拟。研究了冻土帷幕的温度场、应力及位移的分布,计算出冻土帷幕完全形成所需的时间及其压、拉、剪应力极值并确定极值发生的位置。结合现场监测数据,分析了冻结过程中冻土的温度变化规律及冻土帷幕的形成机理,最后提出了相应的措施及建议。In order to study the forming process and mechanical properties of the frozen-soil curtain during the freezing construc- tion of the diversion tunnel through aquiferous and unconsolidated sandstone strata, a 3 - D numerical simulation is made on the process of freezing construction and excavation of the diversion tunnel. The distributions of the temperature fields, stresses and displacements of the frozen-soil curtain are studied, and then the time and the ultimate values of its tensile stress, compressive stress and shear stress necessary for the full formation of the frozen-soil curtain are calculated, while the locations the ultimate values occur are determined as well. Combined with the in situ monitoring data, the temperature changing law of the frozen-soil and the forming mechanism of the frozen-soil curtain are analyzed. At last, some corresponding measures and suggestions are put forward.
关 键 词:含水疏松砂岩 引水隧洞 冻结施工法 数值模拟 引洮供水工程
分 类 号:TV672.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30