出  处:《河北电力技术》2015年第1期41-43,共3页Hebei Electric Power

摘  要:针对一起发电企业在升压变电站安装无功补偿电抗器而产生大量无功调整电价的问题,对发电企业的发、用电量结算方式进行分析,提出在高压备用变压器位置设置计量点、在高压电抗器前端增设计量点等解决措施,为发供电企业在选择贸易结算计量点时提供参考。Based on a case of vast additive power price a power plant used , because of var compensator fixed in it to transmit electricity steady credible, this paper analyses the mode of a power plant to expend and manufacture power to the power grid. And this paper anatomy the arithmetic, excellence and disadvantage of diverse metering quomodo in one connection for a power plant.From this paper,it can take instructor for trade and sttlement between power plant and power supply company.

关 键 词:发电 贸易结算关口 无功功率 电量计算 

分 类 号:TM93[电气工程—电力电子与电力传动] TB971[一般工业技术—计量学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象