检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国矿业大学(北京)资源与安全工程学院,北京100083
出 处:《煤矿安全》2015年第6期77-80,共4页Safety in Coal Mines
摘 要:为了解决深部软岩巷道支护问题,在赵固二矿11030工作面下顺槽这一典型深部软岩巷道进行了围岩变形规律研究和超长锚杆与围岩相互作用机理的分析,得出超长锚杆-锚杆联合支护更能适应巷道围岩的持续变形。在赵固二矿的工业性试验也表明,使用超长锚杆-锚杆联合支护技术后,顶板最大下沉量比原支护方案减少了34.6%,有效地控制了巷道后期的持续变形,使巷道围岩在较短时间内就趋于稳定。In order to solve the support problem in deep soft rock roadway,we research deformation law of surrounding rock and analyze of interaction mechanism of extra-long bolting and surrounding rock in crossheading of 11030 working face,the typical deep soft rock roadway of Zhaogu No. 2 Mine. It indicates that the combined support technology of extra-long bolting and bolting is more adaptable to continual deformation of surrounding rock. The industrial experiment in Zhaogu No. 2 Mine shows that,by using the support technology of long anchor bolt and anchor bolt,the biggest roof subsidence reduces by 34. 6% and the surrounding rock continual deformation in later stage is controlled efficiently. The surrounding rock becomes stable in short time.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.185