龙固煤矿延伸巷掘进防治水及底板注浆加固方案  被引量:5

Water Prevention and Floor Grouting Reinforcement for Extended Roadway Driving in Longgu Coal Mine

在线阅读下载全文

作  者:田成东 白海波[1] 

机构地区:[1]中国矿业大学深部岩土力学与地下工程国家重点实验室,江苏徐州221008 [2]中国矿业大学力学与建筑工程学院,江苏徐州221116

出  处:《煤矿安全》2015年第6期136-138,共3页Safety in Coal Mines

基  金:国家自然科学基金资助项目(50974115);国家重点基础研究发展计划(973计划)资助项目(2013CB227900)

摘  要:针对龙固煤矿复杂的地质条件,通过整理现有物探及钻探资料,对该矿东三采区水文地质概况进行统计分析,确定延伸巷在掘进过程中探水钻孔布置方式及深度,在巷道掘进过程中加强底板富水性探测并制定防治水方案,同时结合相对隔水层分布,并基于底板富水性的分布规律及岩石力学特性的研究基础上,确定巷道底板注浆改造层位及改造厚度。Based on complex geological conditions in Longgu Coal Mine,through the existing geophysical and drilling data,the statistical analysis was carried out about the hydrogeological overview of east third mining area. The layout and depth of extension roadway water exploration drilling was determined in the driving process of extended roadway,during the roadway excavation,the water-abundance detection of floor was strengthened and the program of water prevention and control was made. Combined with the distribution of relative water-resisting layer,in view of rock mechanics and floor water-abundance distribution,the grouting reconstruction position and thickness of roadway floor were determined.

关 键 词:地质条件 巷道布局 超前探测 钻孔设计 效果检验 

分 类 号:TD745[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象