检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴建宇[1] 龙源[1] 纪冲[1] 宋克健[1] 宋歌[1]
机构地区:[1]解放军理工大学野战工程学院,南京210007
出 处:《爆破》2015年第2期95-99,共5页Blasting
摘 要:城市高层框架-筒体建筑大多处在建筑密集的场所,环境复杂,对爆破拆除提出很高要求。南昌五湖大酒店拆除爆破的工程实例中,为减小楼房同时倒塌产生的振动危害效应,采用多段延时起爆技术,使楼房分三段依次塌落。利用ANSYS/LS-DYNA有限元程序对采取定向控制爆破的框架-筒体楼房塌落过程进行了数值模拟,楼房实现了定向塌落,触地后发生纵向断裂和局部破碎,与实际爆破效果相符合。数值模拟方法对于分析建筑物的倒塌模型、预测倒塌过程以及更好的指导爆破拆除施工有较好的帮助,具有显著的工程应用价值。The high-steered frame-tube structures are mostly in places with a high density of buildings and com- plex circumstance,So,there are higher requirements for the demolishing of it. In the case of Nanchang Wuhu hotel explosive demolition,in order to reduce the vibration effect, the delay initiation technique was adopted to make the hotel collapsed in sequence for three sections. The orientation collapse process was simulated by using ANSYS/LS- DYNA. The hotel collapse in specific direction and crack in longitudinal direction and break in local part were in ac- cording to the actual blasting effetely well. Numerical simulation is useful to analysis the collapse model, forecasting the collapse process and guiding engineering practice, which is valuable to engineering application.
分 类 号:TU746.5[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.235