思林水电站升船机闸首卧倒门电液同步控制系统仿真研究  被引量:2

Simulation research on electro-hydraulic synchronous control system of tumble gate in ship lift gate bay of Silin Hydropower Station

在线阅读下载全文

作  者:朱江 宋远卓 倪佳 

机构地区:[1]贵州乌江水电开发有限责任公司,贵阳550002 [2]杭州国电机械设计研究院有限公司,杭州310030

出  处:《华电技术》2015年第5期53-54,79,共2页HUADIAN TECHNOLOGY

摘  要:分析了乌江思林水电站升船机闸首弱刚度卧倒门的启闭问题,设计了主从式双液压缸电液比例同步回路,使用AEMSim软件建立了仿真模型,通过仿真模型验证了主从式双缸同步控制策略在弱刚度卧倒门同步控制应用上的可行性,提出了工程实践建议。The operating of the weak regidity tumble gate in ship lift gate bay of Wujiang Silin Hydropower Station was analyzed.A master-slave electro-hydraulic proportional synchronizing circuit with daul hydraulic cylinders was designed. Using AMESim software,a simulation model was established. The feasibility of application of the master-slave daul-cylinder synchronous control strategy in the synchronous control of the weak regidity tumble gate was verified by the simulation model. Some suggestions of engineering practice were proposed.

关 键 词:升船机 闸首卧倒门 主从式同步回路 AMESim 仿真 

分 类 号:U642[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象