检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河北冀通路桥建设有限公司,河北石家庄050000 [2]长安大学公路学院,陕西西安710064 [3]中交公路养护工程技术有限公司,北京100080
出 处:《筑路机械与施工机械化》2015年第6期72-75,共4页Road Machinery & Construction Mechanization
基 金:交通运输部建设科技项目(2013 318 49A270)
摘 要:为确定路用降温涂层合理的开放交通时间,通过优选多种性能优良的降温功能性材料及辅助材料制备路用降温涂层,对不同类型路用降温涂层降温效果进行研究,测定出不同涂抹量及温度条件下路用降温涂层干燥时间。结果表明:不同类型路用降温涂层降温效果优良,最高降温幅度可达10℃以上;涂抹量为0.8kg·m-2条件下的干燥时间能够满足路用降温涂层开放交通时间的要求;施工温度为20℃时有利于路用降温涂层开放交通。In order to determine the opening to traffic timing of pavement cooling coating, the cooling effeet of different types of coatings was studied by preparing pavement cooling coating with several materials with excellent performance, and the drying time under different amounts and temperatures was measured. It is found out that the maximum cooling temperature could reach 10 ℃;with an amount of 0.8 kg · m^-2 , the timing of opening to traffic could be satisfied; when constructing at 20 ℃, it will be quicker to resume road service.
分 类 号:U414.03[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117