检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:斯林军[1] 张成文 陈若春[1] 吴伟军[1] 唐秋杭[1] 朱继峰
机构地区:[1]浙江省电力设计院,杭州310012 [2]华润电力(温州)有限公司,浙江温州325800 [3]浙江浙能中煤舟山煤电有限责任公司,浙江舟山316131
出 处:《浙江电力》2015年第6期31-34,55,共5页Zhejiang Electric Power
摘 要:针对1个电厂存在不同控制系统(DCS和多种品牌PLC)并有多个运行值班点的现状,通过对多个辅控网配置方案进行技术性、经济性比较,提出先进的主辅DCS一体化设计方案。结合浙能六横发电厂和华润苍南发电厂的系统特点和运行管理模式,量身定制了不同特点的技术方案,并都已成功投运。In the view of different control systems (DCS and several brands of pLCs) and multiple operation duty points in a power plant, this paper presents an advanced design scheme of main and auxiliary DCS sys-tem integration by comprehensive comparison of multiple schemes of main and auxiliary network in terms of economy and technology. Combining with the system characteristics and operation and management mode of Zhejiang Energy Group Liuheng power plant and China Resources Cangnan power plant, it customizes techni-cal schemes with different characteristics, which are already successfully implemented.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28