检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河北钢铁集团矿业有限公司庙沟铁矿,河北秦皇岛066501
出 处:《矿业工程》2015年第3期22-23,共2页Mining Engineering
摘 要:露天转地下矿山在露天减产期和基建期同时进行过程中,实现露天与地下的正常衔接是企业的首要任务。庙沟铁矿根据现场实际情况,设计北端帮部分矿体提前采出,缓解露天减产对企业的影响。根据矿体赋存条件,采用斜坡道开拓、汽车运输、两翼对角式通风。经论证,方案经济合理可行。For open-pit mine to underground during the procedure of reduction of open-pit output together with capital construction,the top priority for the enterprise is to achieve the normal engagement between open-pit and underground. According to the actual conditions on site in Miaogou Iron Ore,the paper designs the orebody at the northern end wall will be mined in advance to supply the reduced ore.According to the occurrence of the orebody,adopt slope ramp development,truck transportation,two-wing diagonal ventilation.After argument,this option is economical,reasonable,and feasible.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30