检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国环境管理干部学院环境工程系,河北秦皇岛066102 [2]秦皇岛市第一污水处理厂,河北秦皇岛066000 [3]秦皇岛排水有限公司第六污水处理厂,河北秦皇岛066000
出 处:《工业水处理》2015年第6期103-105,共3页Industrial Water Treatment
摘 要:秦皇岛某污水处理厂采用A2/O工艺进行污水处理,设计出水满足《城镇污水处理厂污染物排放标准》(GB 18918—2002)的二级标准限值要求。由于对污水排放要求的提高,该厂出水不能外排,需进入中水厂进行深度处理。基于污水处理厂现状,在分析工艺能耗构成的基础上,通过合理确定污水处理程度,调节风机风量分配,对污水提升泵进行变频改造与优化运行,达到了降低污水处理厂能耗的目的。A2/O process has been used for treating the sewage in a sewage treatment plant in Qinhuangdao City. The designed effluent can meet the second class limit value requirements in the "Pollutant Discharge Standard for Urban Sewage Treatment Plants"(GB 18918—2002). Since the requirements for sewage discharge level has been raised,the effluent from that plant could not be discharged into the environment,it is necessary for the effluent to be sent to the reclaimed water plant for advanced treatment. Based on the present situation of sewage treatment plants,and the analysis on process energy consumption,the sewage treatment level needs to be determined properly,the blower capacity needs to be adjusted,and the sewage elevator pump needs to have frequency conversion and optimized operation. Thus,the goal of reducing the energy consumption in the sewage treatment plant has been reached.
分 类 号:X703[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15