检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:程鹏[1] 周昕[1] 罗俊骁 王业华[1] 郁照云 刘利成[1]
出 处:《安徽电气工程职业技术学院学报》2015年第A01期59-61,共3页Journal of Anhui Electrical Engineering Professional Technique College
摘 要:文章介绍巢湖供电公司10k V母线单相接地故障处理流程,分析影响故障处理时间的原因。通过添加特征响铃、建立虚遥信、实现异机监护等技术手段,使调度自动化系统在巢湖公司得到创新性的改进,缩短调控员在调控一体化模式下处理10k V母线单相接地故障时间,提高设备正常运行效率。The workflow of 10kV bus phase-to-ground fault detection in the Chaohu Power Supply Company is introduced , the reason of affecting the fault processing time is analyzed .The dispatching auto-mation system is improved for the first time in the Chaohu Power Supply Company by special alerts , virtu-al remote signals and wardship on the other machine , to shorten the time of dealing with the failure in the model of dispatching and control integration , to improve the efficiency of normal operation of equipment .
分 类 号:TM734[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222