机构地区:[1]山西兰花科技创业股份有限公司唐安煤矿,山西晋城048407 [2]北京中煤矿山工程有限公司,北京100013 [3]天地科技建井研究院,北京100013
出 处:《建井技术》2015年第2期12-14,共3页Mine Construction Technology
摘 要:唐安煤矿为高瓦斯矿井,地面瓦斯抽排井位于风井工业广场附近,直径1m,井深287m,采用反井钻机施工,先钻导向孔,再扩孔到直径1m。瓦斯抽排井主要工程由3部分组成:一是钻进深度287m、直径1m的瓦斯抽排立井;二是安装外径530mm、壁厚15mm的瓦斯抽排管路;三是安装埋深1.5m、长度400m的瓦斯抽排管路。由于施工方案科学合理,实现了安全快速施工。Tang’an Mine is a high gassy mine. A surface gas drainage shaft was located near the mine ventilation shaft industrial square ,was 1 m in diameter and 287 m in depth. The mine gas drainage shaft was constructed with the raise boring machine. A pilot hole was firstly drilled and then was reamed to a diameter of 1 m. The main engineering of the mine gas drainage shaft was consisted with three parts. First was to drill a mine gas drainage shaft with a depth of 287 m and a diameter of 1 m. Second was to install the gas drainage pipeline with a outer diameter of 530 mm and a thickness of 15 mm. Third was to install the gas drainage pipeline with a depth of 1.5 m and a length of 400 m.Due to the scientific and rational construction plan ,a safety and rapid construction was realized for the mine gas drainage shaft.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.89