检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国电力工程顾问集团东北电力设计院有限公司,长春130021
出 处:《吉林电力》2015年第3期15-18,共4页Jilin Electric Power
摘 要:针对地震烈度较高的地区间接空气冷却塔的设计中,存在塔的不同部位的计算控制工况不同,决定塔的断面尺寸选择不同的问题,结合工程实例,对高地震区塔的环基、塔筒、环梁在不同工况下的控制荷载组合,与低地震区间冷塔的设计进行对比分析,给出了当温度应力考虑徐变时、不考虑徐变时及对于8.75度的高烈度地震区域配筋量的选择。The calculation and control conditions are different for different parts of indirect dry cooling tower in high earthquake-intensity area, the section size of the tower is also different. Combined with an engineering for example ,the combination of control loads under different conditions about ring base ,shell and ring beam of tower in high earthquake-intensity area was compared with the tower in no earthquake area. At last reference and bases for design of indirect dry cooling tower in higher earthquake intensity were provided.
关 键 词:间接空气冷却塔 荷载工况 地震烈度 有限元 时程分析
分 类 号:TU311[建筑科学—结构工程] TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222