检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国电建集团成都勘测设计研究院有限公司,四川成都610072
出 处:《水力发电》2015年第7期30-33,共4页Water Power
摘 要:大岗山水电站坝址区地形地质条件复杂,地震烈度高,枢纽布置难度大。根据坝址区水文地质条件,枢纽布置采取混凝土双曲拱坝挡水,坝身深孔、右岸泄洪洞泄洪及水垫塘、二道坝消能防冲,以及左岸引水发电系统,很好地利用了上、下游两个河湾地形,使左岸引水发电系统和右岸泄洪建筑物都能裁弯取直布置,在保证水流顺畅的同时,节约了工程投资。The design of hydraulic structure layout of Dadangshan Hydropower Station is difficult because of complex topographical and geological conditions and high earthquake intensity of dam area. The project layout is consisted of double curvature arch dam, dam flood discharging outlets, right-bank flood discharging tunnel, plunge pool and subsidiary dam for energy dissipation and left-bank water diversion-generating system. This layout program can fully utilize the terrain of upstream and downstream river bends to straighten the arrangement of left-bank water diversion-generating system and right-bank flood discharging tunnel, and save project investment.
分 类 号:TV73[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.51.7