检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长沙市湘江综合枢纽开发有限责任公司,长沙410200 [2]长沙理工大学,长沙410076
出 处:《水道港口》2015年第3期234-238,共5页Journal of Waterway and Harbor
摘 要:结合某低水头航电枢纽泄水闸断面水工模型,对消力池布置方式和差动式尾槛对消能及过沙效果的影响进行模型试验研究。结果表明,将消能墩摆放在泄水闸局部开启时底流最大流速区附近且适当调整消力池长度,以及合理设计差动式尾槛的出池坡度和尾槛长度,可以在保证消力池消能效果的同时,增强消力池内过沙效果。On the basis of cross-sectional hydraulic model test of a low-head navigation hydro-junction, the in-fluences of stilling basin arrangement and differential tail sill on energy dissipation and over sand effect were stud-ied. The results show that in order to guarantee the effect of energy dissipation and enhance the effect of over sand,the energy dissipation piers are located near the maximum velocity zone of end flow, and the length of the stilling ba-sin is adjusted. The slope out of the pool and the last sill length of differential tail sill are designed rationally.
分 类 号:TV135.1[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249