高大采空区充填隔离墙固定成形技术研究  被引量:8

Study on Fixing and Forming Technology of Filling Partition Wall in High and Large Goaf

在线阅读下载全文

作  者:周爱民[1,2] 甯瑜琳[1,2] 詹进 欧任泽[1,2] 宋兴[1,2] 

机构地区:[1]长沙矿山研究院有限责任公司,湖南长沙410012 [2]国家金属采矿工程技术研究中心,湖南长沙410012

出  处:《矿业研究与开发》2014年第4期11-12,20,共3页Mining Research and Development

基  金:国家科技支撑计划(2012BAB21G00)

摘  要:通过对传统充填隔离墙的对比,针对矿山需构筑的充填隔离墙宽度、高度较大的特点,提出了采用袋装充填尾砂砌筑隔离墙,并用钢管、圆钢、锚杆等作为主要构架材料的固定成形技术。经现场工业试验,在挡墙宽度、高度20m左右时,通过该方法砌筑的挡墙稳定性好,对空区内的充填料浆起到了很好的限制作用,最终实现了高大采空区的分区隔离,为矿柱的回收创造了良好的条件。According to the large width and height of the partition wall required in mine,a new fixing and forming technology was proposed by comparing with the traditional filling partition wall,with bagged tailings as filling partition wall and steel pipe,steel rod and anchor bolt as the main framework materials.The industrial field tests showed that under the wall width and height of about 20 meters,the stability of the partition wall built by this technology was good enough to limit the filling slurry in the goaf.Finally,the separation and isolation of the high and large goaf was realized,which provided good conditions for pillar recovery.

关 键 词:袋装充填 隔离墙 高大采空区 矿柱回采 

分 类 号:TD853.35[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象