作 者:黄敏[1,2] 邱纪香[1] 黄明清[3] 唐绍辉[1,2] 吴亚斌[1,2]
机构地区:[1]长沙矿山研究院有限责任公司,湖南长沙410012 [2]金属矿山安全技术国家重点实验室,湖南长沙410012 [3]北京科技大学土木与环境工程学院,北京100083
出 处:《矿业研究与开发》2014年第5期62-65,73,共5页Mining Research and Development
摘 要:以某露天转地下开采为例,采用FLAC3D模拟分析露天坑泥沙层厚度对境界矿柱安全性的影响。结果表明,充填回采过程中采场顶板上方形成平衡拱效应,第7步回填时顶板开始出现拉伸破坏,立柱由于主应力叠加而产生剪切破坏。同时,顶板最大主应力、最小主应力均在第6步至第7步的回填过程中发生突变。应变分析进一步表明,第6步为境界矿柱安全回填临界点,此时泥沙层临界厚度为105m。The FLAC3 Dsoftware was adopted to simulate and analyze influences of sediment layer on boundary pillar safety during the transition from open pit into underground mining.Results showed that an equilibrium arch effect was formed above the stope roof during the backfilling.A tensile failure was detected within the roof during the 7th backfill,while a shear failure was observed within the pillar due to the principal stress accumulation.Simultaneously,the maximum and minimum principal stresses of roof increased dramatically from the 6th to the 7th backfill.In addition,the strain analysis indicated that the 6th filling was the critical step for boundary pillar safety,and the critical sediment thickness was 105 m.
分 类 号:TD164.2[矿业工程—矿山地质测量]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49