检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京科技大学土木与环境工程学院,北京100083
出 处:《矿业研究与开发》2014年第6期14-16,共3页Mining Research and Development
摘 要:某铁矿采用充填法开采,为了减少采矿作业对地表沉降的影响,运用三维数值模拟方法,结合矿体生产实际情况选用不同模型,对矿体及围岩共建立了9种模拟方案,分析了各方案的地表最大沉降值、沉降范围及最大拉应力值的变化规律,最终确定采用采场宽度24 m、灰砂比1∶4这一对地表影响最小的开采方案,为矿山开采决策提供了理论依据。In order to reduce the underground mining influence on surface subsidence,an iron mine,which was mined by backfilling method,is studied.Different models combined with actual production condition of orebody were selected to establish nine different simulation schemes about orebody and surrounding rock by using 3D numerical simulation method.Each scheme's change regulations about surface maximum subsidence,settlement range and maximum tensile stress were analyzed.Finally the mining scheme with the stope width of 24 mand the cement-sand ratio of the backfilling at 1∶4are determined to use.The research provides theoretical basis for mining decision.
分 类 号:TD853.34[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229