基于地质雷达预报的隧道施工风险评估  被引量:10

Risk Evaluation for Tunnel Construction Based on GPR Geological Forecast

在线阅读下载全文

作  者:温世儒[1] 吴霞[2] 杨晓华[1] 吴兴娇[1] 

机构地区:[1]长安大学公路学院,西安710064 [2]江西应用技术职业学院,江西赣州341000

出  处:《西南大学学报(自然科学版)》2014年第8期201-205,共5页Journal of Southwest University(Natural Science Edition)

基  金:广西壮族自治区科技攻关项目(桂科攻10124006-10)

摘  要:为了研究如何避免或者降低在隧道施工风险评估过程中的个体主观性影响,以某公路隧道为依托,分别采用传统的以地质资料和工程经验为主的评估法及基于地质雷达预报的评估法,利用模糊综合评价模型建立风险的权重及隶属度,对隧道施工风险进行对比性评估.将两种不同评估法所得评估结论与工程实际进行比较,结果表明:基于地质雷达预报的隧道施工风险评估法所得评估结论与工程实际更加吻合,评估结论能为施工作业提供有效的指导,达到了满足施工需求的目的.In order to study how to avoid or reduce the influence of individual subjectivity on risk evaluation of tunnel construction, on the basis of the data of a highway tunnel, a comparative evaluation was made for the risk of tunnel construction through two different ways, i. e. the traditional way that is mainly based on the geological data and the engineering experience and a new way that is based on the GPR (ground pen- etrating radar) geological forecast, and the risk's weight and the membership degree were established through the fuzzy comprehensive evaluation model. It is concluded from a comparison of the results from the above two different ways with the data of the real engineering of the tunnel that the evaluation conclu- sion produced based on GPR geological forecast is in better agreement with the engineering practical situation and can provide effective references for the construction work, and the construction needs can be met.

关 键 词:隧道工程 地质雷达预报 模糊综合评价 施工风险 

分 类 号:U458.1[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象