检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]天津市市政工程设计研究院,天津市300051
出 处:《北方交通》2015年第6期40-43,共4页Northern Communications
摘 要:连续梁在顶推施工过程中,由于结构体系不断转换,导致桥墩受力也不断变化,不仅要承受来自梁体的竖向压力还要承受较大的水平推力,致使桥墩出现裂缝,威胁施工安全。因此在施工过程中必须对墩顶位移加以监测,以确保顶推施工过程的安全可靠,保证桥墩的正常使用性能以及耐久性能。对某连续梁桥顶推施工全过程桥墩的受力情况进行了实时监测,并对监测结果进行分析,提出了建议,对类似工程具有参考价值。As the structural system keeps changing during the incremental launching,the stress on piers of the continuous bridge keeps changing as well. The piers have to burden not only the vertical pressure given by the beam but also the horizontal thrust,which will probably lead to cracks on the piers and threats the construction safety. Thus,during the construction,displacement of the pier top shall be strictly monitored to guarantee the safety and reliability of the incremental launching as well as the usability and durability of the bridge. In this thesis,the force bearing status of a certain continuous bridge during the incremental launching process has been monitored in real time and the monitoring results have been analyzed to give further suggestions,which can be regarded as reference for similar cases.
分 类 号:U445.462[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38