铁棉联产的优质矿渣棉生产工艺  被引量:5

Production technology of high quality slag wool based on the joint production process of iron and slag wool

在线阅读下载全文

作  者:王东[1] 周扬民[1] 罗思义[1] 仪垂杰[1] 

机构地区:[1]青岛理工大学冶金炉渣高效资源化利用国家地方联合工程研究中心,山东青岛266520

出  处:《材料与冶金学报》2015年第2期83-86,90,共5页Journal of Materials and Metallurgy

基  金:国家自然科学基金(50934010);青岛市科技计划项目(13-1-4-175-jch;KJZD-12-55-jch)

摘  要:传统的矿渣棉生产工艺是通过冲天炉把冷态物料熔融.较先进的冲天炉能耗水平在445 kg标准煤/吨棉左右.本文提出的"铁棉联产工艺"是将热态的高炉渣转移至调质炉,采用氧煤混喷二次加热技术进行提温,按照既定配比调质后,直接用于生产矿渣棉的工艺.该工艺不仅可大幅降低矿渣棉生产的能耗,同时对于节约用水、提高高炉渣的附加值有着积极作用.铁棉联产工艺是建立在熔融态高炉渣热能完全利用的基础上,其能耗水平在240 kg标准煤/吨棉.充分考虑其他配套设施,铁棉联产的矿渣棉工序能耗更低、生产优势突出.The solid materials were melted in a cupola for the traditional production process of the slag wool,in which the energy consumption was more than 445 kgce/t. A new process called "The Joint Production Process of Iron and Slag Wool"w as proposed. The hot blast furnace slag is transferred to a furnace,where the hot slag is reheated by oxygen coal mixing injection technology,and composition of the hot slag is adjusted. Then,the hot slag is directly used to produce mineral wool. The new process can not only greatly reduce the energy and water consumption,but also can improve the added value of the blast furnace slag. Because the joint production process of iron and slag wool is base on fully utilizing the molten blast furnace slag heat,the energy consumption level of this process is only 240 kgce /t. It believed that the process has obvious advantage.

关 键 词:矿渣棉 铁棉联产 高炉渣 能耗 成本 

分 类 号:TF09[冶金工程—冶金物理化学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象