检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张晓平[1]
机构地区:[1]北京金马威工程咨询有限公司,北京100086
出 处:《建筑经济》2015年第7期57-60,共4页Construction Economy
摘 要:从安全文明施工费、变更、暂估价、发包人认价时效、预付款支付、进度款计量与支付、竣工结算、最终结清共八个方面对比分析13版清单计价规范与13版施工合同示范文本矛盾之处,并提出改进建议。The article analyzes the contradiction between inventory valuation norms of 2013 version and construction contract model text of 2013 version, mainly from the aspects of the cost of safe and civilaized construction, alteration, estimating temporarily price, developer think price limitation, advance payment, the process model of measurement and payment, final account for completed project, and final settlement. At the same time, offers some suggestions for improvement and expectations.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117