作 者:王炜
出 处:《贵州电力技术》2015年第7期89-91,94,共4页Guizhou Electric Power Technology
摘 要:本文从变电站土建设计出发,以实际工程设计中可行性研究阶段、初步设计阶段土建专业的总平面布置、竖向布置及建筑结构方案的选择是否合理,进行探讨和分析,以优化整个工程的设计方案;在选用南方电网标准设计模块的前提下满足使用要求的同时根据实际情况对标准设计进行优化,并提出全户内变电站在现阶段的技术创新方案,以实现变电站全过程、全寿命周期的合理规划设计。This article embarked from the substation construction design, combining with practical engineering feasibility study stage, the preliminary design stage in the design of civil engineering specialty of general plot plan, vertical layout and architectural structure estimated whether this designs were reasonable, and carried on some discussion and analysis, to optimize the whole project design; In selecting southern power grid under the premise of standard design module according to actual condition meet the requirement of design is optimized to the standard at the same time, and put forward the whole indoor substation technology innovation plan at this stage, should be paid more attention when drew construction design, came true the whole process and the whole life cycle of reasonable planning and design of substation.
关 键 词:土建设计 全户内 总平面布置 竖向布置 设计优化 施工图 细节
分 类 号:TM63[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3