作 者:盛蓉蓉[1]
机构地区:[1]中铁第四勘察设计院集团有限公司,武汉高级工程师430063
出 处:《城市轨道交通研究》2015年第7期40-43,共4页Urban Mass Transit
摘 要:南车株洲电力机车有限公司厂区内试验线路上既有DC750 V牵引变电所无法满足地铁车辆型式试验的电压要求。结合该试验线的特点,提出在试验线路新建1座牵引变电所,与既有牵引变电所构成双边供电,以满足地铁车辆型式试验的电压要求。同时,给出了可输出DC750 V、DC1 500 V两种不同电压等级的新建牵引变电所设计方案及设备选型。In CSR Zhuzhou Electric Locomotive Co. ,Ltd, the existing DC 750 V traction on the factory test line could not satisfy the requirement for the testing voltage of new metro train. According to the line characters, it is proposed that a new traction substation be built on the test line to constitute bi- lateral power supply substation with the existing DC 750 V traction, so as to meet the requirements of test voltage on new- type metro vehicle. At the same time, the design of new trac- tion substation with two different voltage grades of power sup- ply: the output DC 751) V and DC 1 500 V, and the related equipment selection are discussed.
分 类 号:U224[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33