检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘书安[1] 丁明华[1] 李涛[1] 汪安乐[1] 刘加俊[1]
机构地区:[1]北京建工集团有限责任公司总承包部,北京100055
出 处:《建筑技术开发》2015年第7期38-41,共4页Building Technology Development
摘 要:宜兴文化中心博物馆基坑开挖土层位于淤泥质土层,工程桩采用预应力高强管桩,施工前采用管井降水,修筑双轴水泥土搅拌桩临时运输道路,分层开挖、接力运土,地下室集水井等深坑部位采用高压旋喷桩围护,有效地解决了淤泥质土开挖过程中工程桩倾斜、滑移及断桩的问题。施工过程中,虽处于雨期,但深坑围护结构整体完好,确保了基坑开挖的顺利进行及工程桩的安全,取得了良好的效果。The foundation pit excavation of the museum project of Yixing Cultural Center involved a silty soil stratum, so high-strength prestressed tubular piles were used. Before construction, tube well was used for dewatering and temporary transportation path for dual-axes soil-cement mixing piles was built to realize excavation on different layers and earth relay transportation. High-pressure rotary-spray pile enclosure was constructed in deep pits, such as basement sump pit, etc. These measures successfully solved the problems in excavation of silty soil, such as inclination, slippage and breaking of engineering piles. Although the construction encountered the raining season, the enclosure structure of the deep foundation pit was stable and smooth excavation of foundation pit was guaranteed, realizing favorable construction effects_
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229