检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马天驰[1]
机构地区:[1]黑龙江工程学院测绘工程学院,黑龙江哈尔滨150050
出 处:《黑龙江工程学院学报》2015年第3期22-24,共3页Journal of Heilongjiang Institute of Technology
摘 要:哈齐铁路客运专线是我国目前纬度最高的高速铁路,大部分路段位于湿地之上,冬季长,气温低,路基冻胀将直接影响高速铁路运行安全。为确保哈齐客运专线安全运营,在建设期对路基进行同步冻胀变形监测。采用水准测量的方法,通过秋、冬、春三季对典型路段路基进行监测,分析冻胀变形可能对铁路运营带来的影响,采取有效措施加以克服,确保运营安全。So far,Harbin-Qiqihar passenger dedicated line has been a high-speed railway building in the highest latitude area in China,most of which segments are located in wetlands.Due to the relatively longer winter and lower temperature,the safety of operation will be affected directly by the phenomenon of subgrade frost heaving.With the railway being constructed,the deformation monitoring in subgrade frost heaving has to be done in order to ensure the safety of operation.By means of leveling surveying,the subgrade of typical segment is monitored and measured in autumn,winter and spring.The possible negative effects on railway operation caused by subgrade frost heaving are studied,and the effective measures are taken to undo the adverse effect,sequentially ensuring the safety of wailway operation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7