检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《陕西电力》2015年第6期83-87,共5页Shanxi Electric Power
摘 要:酒泉至湖南±800 kV特高压直流实现风电与火电打捆外送电力8 000 MW。为得到直流风火打捆的比例,通过分析直流送端风火打捆的必要性,结合甘肃实际风电出力特性对直流配套的风电一火电一直流理论输送容量进行计算,比较不同配套火电规模下火电及直流利用小时数、弃风电量以及直流送电曲线,最后给出合理的酒泉直流风火打捆比例及合适的配套火电规模范围。The ±800 kV UHVDC project from Jiuquan to Hunan is designed to send out power of 800MW, which transmits electricity through wind and thermal power bundling. In order to get the ratio between wind and thermal power, the necessity of wind and thermal power bundling is analyzed. Combined with the Gansu wind power output characteristics, HVDC sending capacity of wind power-thermal power-transmission capacity in theory is studied. Considering the thermal power and HVDC using hours, abandoned electric quantity of the wind, HVDC transmission curve ere,the reasonable ratio of wind and thermal power bundling of HVDC sending is put forward.
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15