系杆拱桥吊杆索力张拉的模型试验研究  被引量:4

Experimental study on cable tension of tied arch bridge model

在线阅读下载全文

作  者:邓晓[1] 王起才[1] 张戎令[1] 杨阳[1] 

机构地区:[1]兰州交通大学土木工程学院,甘肃兰州730070

出  处:《铁道建筑》2015年第6期17-19,共3页Railway Engineering

基  金:长江学者和创新团队发展计划项目(IRT1139);国家自然科学基金资助项目(51268032);兰州交通大学青年科技基金项目(2012028)

摘  要:钢管混凝土系杆拱桥吊杆索力张拉是系杆拱桥施工的重要步骤。本文结合相似比理论,根据现场实际桥梁模拟浇筑1∶16试验模型,采用有限元分析得出实际桥型与实验室模拟桥型的索力张拉值。通过与兰新铁路第二双线实际桥梁的张拉值对比,得出索力张拉顺序对各个吊杆索力的影响,以及索力在第一次张拉完成后实测值与预期张拉值的相差值,通过实测值反推出系杆拱桥索力张拉初始值。实验室桥梁模型模拟实际桥型进行索力的测定和调整,对现场施工以及对系杆拱桥的调索具有指导意义。Cable tension of CFST ( concrete filled steel tube) tied arch bridge is a key step in construction. Similarity ratio theory and model test were introduced in this paper. T he ratio of the model to the real structure was 1/16. Finite element method was applied to analyze the cable tension in both the model and the structure. W ith comparison to the cable tension in the bridge in the second double line of Lanxin Railway,the effect of the tension order on the tension in each suspender was analyzed. T he tension ( after the first tension) difference between the predicted and the measured was calculated,and the initial tension was calculated based on the measured value. T he model test was performed,simulating the real structure. T he cable tension of the model was measured and adjusted,contributing to the construction of the real structure.

关 键 词:系杆拱桥 相似比理论 有限元模拟 索力张拉 

分 类 号:U448.225[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象