检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京航空航天大学经济管理学院,北京100191
出 处:《工业工程》2015年第3期69-74,共6页Industrial Engineering Journal
基 金:国家自然科学基金资助项目(71271019)
摘 要:为了在软件开发项目中同时解决项目活动调度问题和多技能人员指派问题,实现资源均衡分配,本文建立了一个多技能人力资源均衡调度的混合整数规划模型,并以一个软件开发项目为背景开展了算例研究,采用Lingo11软件环境下改良后的分支定界法进行优化求解。优化之后,项目资源强度方差和员工工作量方差大幅度下降。研究结果表明,本文创建的资源均衡调度模型可以显著提高项目周期内员工需求量和员工工作量分配的均衡水平。In order to simultaneously solve the project scheduling problem and multi-skill staff assignment and reach a balanced resource allocation in software development projects, a mixed integer programming model with multi-skill human resource levelling scheduling is established. A software development project instance is calculated by Lingol 1 with improved branch and bound method. After the optimization, vari- ances of both resource intensity and staff workload have a significant reduction. This optimization result confirms that the new model can significantly improve the equilibrium level of demand for employees and staff workload distribution in project lifecycle.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43