洪江水电站闸门调度试验  

The gate operation test of Hongjiang Hydropower Station

在线阅读下载全文

作  者:王怡 

机构地区:[1]中国电建集团中南勘测设计研究院有限公司,湖南长沙410014

出  处:《湖南林业科技》2015年第4期52-55,66,共5页Hunan Forestry Science & Technology

摘  要:以不同工况的消能复核和下游冲刷复核为控制,先通过模型试验确定洪江水电站左闸运行调度、右闸运行调度及左右闸联合泄洪调度的方式,再根据模型试验泄流数据的整理结果,分析闸门相对开启高度(he/H)与参数(q2/g H3)之间的关系,得出适应任何上游水位,任何洪水来量,任何机组运行台数的洪江水电站闸门调度粗估公式。In different working condition of review of energy dissipation and scour downstream check for control,left brake operation scheduling,right brake operation scheduling and brake joint flood dispatching of the Hong Jiang Hydropower Station was determined through the model test. Discharge through the model test data and analysis of the gate relatively high open( he/ H) on the relationship with the parameters( q^2/ g H^3),it was concluded that gate operation formula adapt to any upstream water level,any floods to quantity,and any unit of the Hong Jiang Hydropower Station.

关 键 词:洪江水电站 闸门调度 消力池 冲坑 

分 类 号:TV73[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象